# General Contractors source update — 14 October 2026

This video is a dated teaching example, not a quote, takeoff or company-eligibility decision. Its original spoken dates and captions remain exact. Current checked source: [Carson City FHWA office renovation, 47PD5526Q0051](https://sam.gov/opp/c879b4befcd64d0bad2b7e6a842213e6/view).

Amendment 0002, page 3, extends quotes to **28 October 2026 at 4 p.m. Pacific / 6 p.m. Central**. The round-two question deadline was **13 October at those times and has passed**. The original RFQ's 14 October date is superseded. The September site-walk and earlier question dates are also historical. Do not submit to an elapsed question window or assume a new opportunity to visit.

The amendment adds Attachment F, Floor Plan Drawing, and requires signed blocks 15A–15C with the quote. This selected-page walkthrough has not visually verified that drawing or completed a full package/takeoff review. Check all current documents and site conditions before pricing.

The eight current document slots are reported readable. Today's independent source selection comprises 18 units and 56,249 characters from a 254,381-character solicitation. This coverage does not establish full-document, full-case or business eligibility.

Keep the two similar completed-project narratives, three-year recency from the original issue date, permissible joint-venture/subcontractor contributions to major or critical work and prime in-house onsite/management relevance conditions together. Neutral treatment for absent history does not erase required submission content. Separate these from the two-page technical approach and other required volumes.

The $50,000–$100,000 range is an estimate, not an awarded price. Preserve 60 calendar days after notice to proceed, actual line-item labor/material quantities, wage rules, insurance within ten days and 100% payment protection within ten days for performance plus one year. Read conflicting forms and incorporated construction-payment provisions; no universal bond threshold or generic Net-30 promise is implied.

Historical reported-code buying and forecasts remain dated. NAICS 236220 records are not all federal construction or reachable revenue. Award/action/obligation definitions, anomaly warnings, restricted vehicle access and positive-value cohort exclusions remain intact; no SQL or media rerun. Planning forecasts are not open bids or guaranteed rebids.

Current materials and assistant setup: https://qualifiedbid.qualifiedcapacity.com/learn/ . The Assembly reference in the sealed narration is historical; this release adds no Circle publication.
